Qingzhou Bocheng Machinery Co.,Ltd.
|
Payment Terms: | T/T,L/C,D/A,D/P,WU |
Place of Origin: | Shandong, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
1 | Rated load | 27T | ||
2 | overall weight | 28T | ||
3 | maximum tractive force | 200KN | ||
4 | maximum breakout force | 200KN | ||
5 | overall dimension (L×W×H) | 8880*3100*3500mm | ||
6 | maximum grade ability | 25-30°C | ||
7 | maximum dump height | 2700mm | ||
8 | maximum dump reach | 2220mm | ||
9 | minimum turning radius | 4590mm | ||
Engine | 11 | model | Weichai Steyr DHD10G0353 | |
12 | type | lnline water cooling dry cylinder injection | ||
13 | No. of cylinder-bore/stroke | 6-126×130mm | ||
14 | rated power | 175kw--2200r/min | ||
15 | maximum torque | 843N.m | ||
16 | min fuel-consume ratio | ≤220g/kw.h | ||
Transmission system | 17 | torque converter | ||
18 | gearbox mode(WG180) | Planectary | ||
19 | 2 forward shift | 1 reverse shift | ||
20 | maximum speed | 38km/h | ||
Drive axles | 21 | main reducing spiral | bevel gear grade 1reduction | |
22 | decelerating mode | planetary reduction,grade 1 | ||
23 | wheel base (mm) | 3350mm | ||
24 | wheel tread | 2250mm | ||
25 | minimum ground clearance | 450mm | ||
Hydraulic system | 26 | system working pressure | 18MPa | |
27 | boom lifting time | 7.7s | ||
28 | total time | 15s | ||
29 | fuel tank capacity | 300L | ||
30 | function of leveling automatically | yes | ||
Brake system | 31 | service brake | air over hydraulic disc brake on 4 wheels | |
32 | parking brake | manual parking brake | ||
Tyre | 33 | type specification | 26.5-25 | |
34 | front tyre pressure | 0.55Mpa | ||
35 | rear tyre pressure | 0.55Mpa |